History
Railway operation in today's Bangladesh began on November 15, 1862 when 53.11 kilometres of 5 ft 6 in (1,676 mm) (broad gauge) line were opened for traffic between Dorshona of Chuadanga District and Jogotee of Kushtia District. The next 14.98 kilometres 1,000 mm (3 ft 3 3⁄8 in)(metre gauge) line was opened for traffic on 4 January 1885. In 1891, the construction of then Bengal Assam Railway was taken up by the British Government assistance but that was later on taken over by the Bengal Assam Railway Company. On 1 July 1895, two sections of metre gauge lines were opened between Chittagong and Comilla, a length of 149.89 kilometres and between Laksam Upazila and Chandpur District, a length of 50.89 kilometres. Railway Companies formed in England took up the construction and operation of these sections in middle and late 19th century.[5]